Temporary Boiler for Water Chiller Heat load testing
The Survey
The survey ended being quite technical as the chillers were already in position on the roof of the building, this meant the heating would need to be pumped onto the roof from the ground floor carpark. A bypass was specified to help reduce the heat input and the boiler used would also be fitted with wireless controls to turn it off when the desired temperature was reached in the buffer tank.