This application required an opposing heat source to load test a data centre cooling capacity to prove the chillers were capable of rejecting the heat put into the system by the temporary boiler. Due to the input temperature restrictions of the chillers and the lack of power to run electric boilers a gas fired boiler was sought to provide a solution.